Home
About GC Stanley
Our Services
Projects
Our Customers
US Army Afghanistan
Design Build Services
Request Proposal
Apprentice Training
Employment
Contact Us

 

 

Design-Build

Serving

Construction
Retail
Institutional
Industry
Highway
Communications
Gasoline Marketing
Utility

Design Services

Electrical Distribution
Commercial Interiors
Interior Lighting Systems
Lighting Controls
Gasoline Marketing Systems
Grounding Systems
Industrial Controls
Relay Logic
Programmable Logic
PLC Programming
Environmental Controls
Energy Management
HVAC Control
Lighting Systems

Design-Build Advantages

The Design/Build approach can provide engineering and construction under a single contract. This results in a single point of responsibility, maximum control by the Owner and immediate responsiveness by the contractor. "Finger pointing" is eliminated because G. C. Stanley, Inc. is solely responsible for all aspects of the electrical system.

Time
The total project duration is significantly reduced, giving the owner use of the facility sooner. While design is being developed, purchasing, scheduling and actual installation can begin. This short-cuts the lengthy design and bid period.

Value Engineering
This may be based on knowledge of constructability issues, the newest methods that have been successfully employed, or knowledge of specific trends. The electrical contractor is often in the best position to advise the most cost-effective design or product specification.

Enjoy savings from purchasing factory  direct such as eliminating the middleman, increased value and customer service and all this without sacrificing quality. 

Early Knowledge of Firm Price
The Owner benefits from knowing budget pricing as the design development is occurring. Then, as the design criterion solidifies, G. C. Stanley, Inc. can provide a firm price. Several contracting methods are available that create a partnership, between the Owner and G. C. Stanley, Inc. committed to keeping the project under the established budget.

Reduced Administrative Burden
The Owner is not required to invest resources preparing R. F. P.'s, conducting the extensive evaluations, or coordinating and arbitrating between separate design and construction contracts Rather, the Owner can focus on timely decision making.